Pipeline entity

Pipeline entity

* Source : * Author : admin * Time : 2014-10-24 * Browse : 28
0
         PRO / ENGINEER provides a dedicated management design module PRO / Piping. According to good outdoor sheet metal model (Figure 1) has been designed, we use PRO / Piping feature air-conditioning outdoor piping design (Figure 3). The traditional pipeline design method is mainly on physical measurements, and then repeatedly making piping installed sample checking, long design cycles. The use of PRO / Piping were piping design a good solution to this problem, due to its full three-dimensional design model parameters, making the pipeline when the project developers during the design, not only for the pipeline process of three-dimensional space location has a global consideration, while a more comprehensive account of the pipeline due to drop and vibration and noise caused by transport and other areas, thereby increasing the success rate and reliability of pipeline piping design shorten the development time.
         At the same time due to the height of parts commonality and standardization, coupled with the appearance of similar compressor, we can use PRO / ASSEMBLY The Restructure of four-way valve components (Figure 2) to re-build, and then create a four-way valve components SaveaCopy, then using MATE, ALIGN, INSERT, ORIGN like assembly. Then modify the parameters of the pipeline, will soon be able to build a good initial new way valve components, thereby greatly reducing the preliminary ideas for piping components and design time. This is also the PRO / E highly parameterized benefits.
         Because of PRO / E in the design like the features, so to shorten the development cycle to ensure that the quality of design, but also greatly reduce the number of samples. This reduces the cost of the development is quite obvious. Also the use of PRO / E of AssemblyMassProperties, by the density of the material input component to obtain volume, surface area and quality data (Figure 4), which for the early parts of the pipeline cost estimates are very useful. In particular, a sharp rise in raw material prices, control the cost of materials has become a major part of cost control. Design and development staff can use this feature early in the design of cost-effective control.
News Category